|
Friday17th
On row to Emsworth via Marker, much water (Half inch over floorboards) was completely pumped out on arrival at Emsworth Quay. This was assumed to be rainwater collected through the cover over the last few days, however on arrival back at the Mill a similar amount was found and allowed to drain out of the boat.
Probably there is a leak in the bow, so may I suggest to all that she is not beached on arrival at a destination, but brought to a halt before reaching the beach?
|