Shedual of varnishing

classic Classic list List threaded Threaded
8 messages Options
Reply | Threaded
Open this post in threaded view
|

Shedual of varnishing

Geoff Shilling
Wed 23 Jan. Hull Nigal and Alan
Thurs 24 Jan hull Rachael and Geoff
Fri 25 Jan hull Chris and Geoff.
Week 3
Monday at 1400. Lots of help required to turn boat and Varnish inside.
Tuesday at 1000 coat 2 on inside
We'd at 1000 final coat on inside  
 
 The lift needs lots of help
Six people are needed each day to varnish. Training will be given.

Geoff
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Sue Loveridge
I can come on Monday. Sue
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Christine
This post was updated on .
In reply to this post by Geoff Shilling
i can do Monday, planning to row Tuesday morning, but happy to come over later if that is needed. Should be OK so far for Wednesday.
Christine
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Liz Hall
In reply to this post by Geoff Shilling
I can do Tuesday morning.  Liz
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Matt O’Neill
In reply to this post by Geoff Shilling
I’m definitely free Monday to help, hopefully Tuesday too. See you then
Matt
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Matt O’Neill
In reply to this post by Geoff Shilling
Hi Geoff
I’m really sorry, but I’ve been called into the office now today. I can definitely come and help tomorrow though.
Matt
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

nigel
In reply to this post by Geoff Shilling
Monday and Wednesday OK for me
Reply | Threaded
Open this post in threaded view
|

Re: Shedual of varnishing

Liz Hall
In reply to this post by Geoff Shilling
Sorry I can no longer come on Tuesday as I have lots of work to do.  John is also working.
Liz